1) Floor & Wall Tile Hacking
- Removal of ceramic, porcelain, marble, homogeneous and vinyl finishes
- Removal of adhesive and screed where specified (for new tiling tolerance)
- Controlled hacking to protect structural slab and adjacent finishes
- Dust sheet containment to prevent spread to live areas
2) Wet Area / Toilet / Kitchen Hacking
- Full strip-out of existing tiles, skirtings, counters, sanitary fittings
- Removal of old waterproofing layer when new waterproofing is planned
- Debris protection for chute/vertical plumbing areas
- Proper sealing after stripping to avoid water leakage to units below
3) Partition / Non-Structural Demolition
- Hacking of block, AAC, drywall or partition systems
- Safe sequencing near electrical/mechanical routing
- Protection of structural elements — we do not hack structural walls without PE approval
- Debris staged and removed without obstruction to common corridors
4) Debris Management, Haulage & NEA Disposal
- Internal collection, bagging and staging
- Loading to lorry / skip with protection to lift & common areas
- Transport to NEA-approved construction waste facilities
- Issuance of tipping receipts as legal proof of disposal (important for MCST/landlords/audits)
5) Dust, Noise and Safety Control
- Poly sheet containment and zipper enclosures where required
- Negative pressure / vacuum extraction for sensitive environments\
- Work scheduled within permitted HDB/MCST noise windows
- PPE, barricading and WSH safe work procedure
6) Final Preparation for Next Trade
- Vacuum & clear sweep after hacking
- Substrate condition photo-record handed over
- Surface ready for tiling, leveling, waterproofing or reinstatement
- Optional — temporary boarding or protection after handover
Why Proper Hacking Matters in Singapore
Cut-price hacking crews often:
- Dump illegally (risking fines for client and MCST complaints)
- Hack outside HDB quiet hours (leading to stop-work)
- Damage slab / waterproofing (causing neighbour water claims)
- Provide no documentation (no defence during handover disputes)
7M delivers defensible, documented and compliant work — important for:
- MCST audit & reinstatement release
- Main contractor QS submission & BOQ compliance
- Insurance & defect liability control
- Avoidance of renovation stop-work orders